TY - JOUR
T1 - Field performance of steel pipes during curve jacking in Gongbei tunnel
AU - Zhang, Peng
AU - Feng, Xin
AU - Zeng, Cong
AU - Ariaratnam, Samuel T.
N1 - Funding Information:
The authors thank Guangdong Nanyue Transportation Investment &Construction Co., Ltd. and China Railway 18th Bureau Group Co., Ltd. for cooperation in the field tests and data collection of soil deformation of curved pipe jacking. This study is also supported by the National Nature Science Foundation of China (52008383), the Fundamental Research Funds for the Central Universities, China University of Geosciences (Wuhan) (No. CUG190605).
Funding Information:
The authors thank Guangdong Nanyue Transportation Investment &Construction Co. Ltd. and China Railway 18th Bureau Group Co. Ltd. for cooperation in the field tests and data collection of soil deformation of curved pipe jacking. This study is also supported by the National Nature Science Foundation of China (52008383), the Fundamental Research Funds for the Central Universities, China University of Geosciences (Wuhan) (No. CUG190605).
Publisher Copyright:
© 2022 Elsevier Ltd
PY - 2022/10
Y1 - 2022/10
N2 - Pipe-soil contact pressure is a critical parameter in the whole pipe jacking construction process. Most of the existing pipe jacking standards do not distinguish rigid and flexible pipes, in terms of pipe-soil pressure calculation methodologies, nor do they take into account the impact of different construction conditions. In order to study the mechanical characteristics during curved steel pipe jacking with large buried depth, the contact pressure and pipe stress of curved pipe jacking were monitored and analyzed, based on Gongbei curved pipe jacking roof tunnel project. The results show that contact pressure and pipe stress are significantly asymmetric during the jacking process. In general, the values of contact pressure at crown and bottom are relatively close, and the crown pressure is slightly larger than that at the bottom. The horizontal contact pressure inside of pipe jacking curve is less than the outside. The pipe axial stress is mainly affected by jacking force, and hoop stress mainly depends on ring load out of pipe. The compression occurs inside of pipe jacking curve with more obvious stress concentration. With the increase of jacking distance, the pipe axial stress transforms from full sectional compression to local compression.
AB - Pipe-soil contact pressure is a critical parameter in the whole pipe jacking construction process. Most of the existing pipe jacking standards do not distinguish rigid and flexible pipes, in terms of pipe-soil pressure calculation methodologies, nor do they take into account the impact of different construction conditions. In order to study the mechanical characteristics during curved steel pipe jacking with large buried depth, the contact pressure and pipe stress of curved pipe jacking were monitored and analyzed, based on Gongbei curved pipe jacking roof tunnel project. The results show that contact pressure and pipe stress are significantly asymmetric during the jacking process. In general, the values of contact pressure at crown and bottom are relatively close, and the crown pressure is slightly larger than that at the bottom. The horizontal contact pressure inside of pipe jacking curve is less than the outside. The pipe axial stress is mainly affected by jacking force, and hoop stress mainly depends on ring load out of pipe. The compression occurs inside of pipe jacking curve with more obvious stress concentration. With the increase of jacking distance, the pipe axial stress transforms from full sectional compression to local compression.
KW - Contact pressure
KW - Curved steel pipe jacking
KW - Field monitoring
KW - Parallel pipe jacking
KW - Pipe stress
UR - http://www.scopus.com/inward/record.url?scp=85135828132&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85135828132&partnerID=8YFLogxK
U2 - 10.1016/j.tust.2022.104585
DO - 10.1016/j.tust.2022.104585
M3 - Article
AN - SCOPUS:85135828132
SN - 0886-7798
VL - 128
JO - Tunnelling and Underground Space Technology
JF - Tunnelling and Underground Space Technology
M1 - 104585
ER -