This research was funded by the National Science Foundation, the Levi Strauss Foundation, and the Surgikos Division of Johnson and Johnson in Cd. Juárez, México. The authors acknowledge Dr Donald Senich, Program Director of the NSF-GOALI programme, and Dr. Larry Seiford, NSF Operations Research and Production Systems Program Director. Our gratitude is extended to Ms Annette Morales, director of the El Paso, Texas Levi Strauss Foundation for her support. Further, Mr Vidal Guzman, process engineer at Surgikos and Robin Lankford, process manager at Levi Strauss, are acknowledged for their technical support and guidance. Mr Juan Ortiz, an IE graduate student at the University of Texas at El Paso, performed the data collection and created the computer simulations.
PY - 2009/1
Y1 - 2009/1
N2 - This case study develops an innovative management and scheduling system for corrective maintenance of machines in a manufacturing facility. The study also involves a comparative evaluation of the proposed and the existing systems under a spectrum of operating conditions. A comprehensive simulation is used to evaluate system performances under a variety of settings which include reliability, service level, and cost consequences. The analysis is based on a full factorial experimental design. In summary, the developed self-regulating management system which involves dynamic work allocation and pre-emption is shown to yield higher machine availability and higher mechanic utilisation even with fewer mechanics. The study also finds that the new system is more streamlined, agile, and robust although it is subject to more-constrained machine reliability and mechanic service time environments. Further, a major reduction of current manpower can still achieve at least 95% machine availability, illustrating the cost effectiveness and efficacy of the developed system. This rule-based corrective maintenance system can be operated in uncertain environments on a real-time basis without additional reformatting costs and provides a competitive measure to deal with managerial issues such as low retention rate for skilled mechanics, highly uneven training levels and pay scales. The financial consequences and gains in strategic advantage with respect to the facility's operational structure are promising after implementation. Moreover, the system developed in this case study represents a meaningful starting point for a more vigorous theoretical research on the bucket brigade system to different functions in industrial and operations management.
AB - This case study develops an innovative management and scheduling system for corrective maintenance of machines in a manufacturing facility. The study also involves a comparative evaluation of the proposed and the existing systems under a spectrum of operating conditions. A comprehensive simulation is used to evaluate system performances under a variety of settings which include reliability, service level, and cost consequences. The analysis is based on a full factorial experimental design. In summary, the developed self-regulating management system which involves dynamic work allocation and pre-emption is shown to yield higher machine availability and higher mechanic utilisation even with fewer mechanics. The study also finds that the new system is more streamlined, agile, and robust although it is subject to more-constrained machine reliability and mechanic service time environments. Further, a major reduction of current manpower can still achieve at least 95% machine availability, illustrating the cost effectiveness and efficacy of the developed system. This rule-based corrective maintenance system can be operated in uncertain environments on a real-time basis without additional reformatting costs and provides a competitive measure to deal with managerial issues such as low retention rate for skilled mechanics, highly uneven training levels and pay scales. The financial consequences and gains in strategic advantage with respect to the facility's operational structure are promising after implementation. Moreover, the system developed in this case study represents a meaningful starting point for a more vigorous theoretical research on the bucket brigade system to different functions in industrial and operations management.
KW - Corrective maintenance
KW - Dynamic work allocation
KW - Machine reliability
KW - Pre-emption
KW - Real-time labour dispatching
KW - Service levels
UR - http://www.scopus.com/inward/record.url?scp=70449686055&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=70449686055&partnerID=8YFLogxK
U2 - 10.1080/00207540701824225
DO - 10.1080/00207540701824225
M3 - Article
AN - SCOPUS:70449686055
SN - 0020-7543
VL - 47
SP - 3539
EP - 3557
JO - International Journal of Production Research
JF - International Journal of Production Research
IS - 13
ER -