Abstract
A three stage superconducting undulator (modulator, dispersive section, and radiator) is under construction at Brookhaven National Laboratory. Sections of the radiator, consisting of 25 cm long steel yokes, each with 18 mm period, 0.54 T field, and 8.6 mm gap are under test. The magnetic measurements and operational characteristics of the magnet are discussed. Measurement results and analyses are presented, with emphasis on the integrated field quality. The magnet winding and the effects of the various trims are discussed.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 411-413 |
| Number of pages | 3 |
| Journal | Nuclear Inst. and Methods in Physics Research, A |
| Volume | 358 |
| Issue number | 1-3 |
| DOIs | |
| State | Published - Apr 11 1995 |
| Externally published | Yes |
ASJC Scopus subject areas
- Nuclear and High Energy Physics
- Instrumentation
Fingerprint
Dive into the research topics of 'Magnetic field measurements of the harmonic generation FEL superconducting undulator at BNL-NSLS'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS