TY - GEN
T1 - Case study
T2 - Construction and Building Research Conference of the Royal Institution of Chartered Surveyors, COBRA 2008
AU - Sullivan, Kenneth
AU - Michael, John
AU - Egbu, Charles
N1 - Funding Information:
This work was supported in part by National Science Council of the Republic of China under Contract NSC 81-0408-E-003-503.
PY - 2008
Y1 - 2008
N2 - From 1994- present, the Performance Based Studies Research Group (PBSRG) has been testing the best value Performance Information Procurement System (PIPS), running over 530 tests on the delivery of $683M of construction services. The research results identified the low price award by the procurement function as a major source of nonperformance. It also identified that the following manifestations of the price based system: the inability of the client construction management to transfer risk and control to the contractor, the adversarial position between general, critical subcontractors and the client, the inability to differentiate, and the resulting loss of capability of the industry to preplan, proactively minimize risk, and inability to successfully administer the contract. The hypothesis testing results concluded that the issues with construction nonperformance were not technical, but management based. The issues dealt with delivery, and not construction technical performance. In 2005, PBSRG convinced the Arizona State University (the largest university in the United States at 65,000 people) Procurement office, to test this hypothesis, by using best value PIPS to procure the largest food services contract at a U.S. university, approximately $400M, ten year contract. The results of the test also convinced ASU procurement office to use the PIPS based concepts to transform the business approach of the university to a pure outsourcing approach with best value selection, information environment using dominant measurements, self administration of the contract by the contractor, and reorganization and a change of function of client procurement/management. These results validate the hypothesis testing to improve the construction industry performance. This is the first significant concept developed in construction management research that has been validated in the services industry.
AB - From 1994- present, the Performance Based Studies Research Group (PBSRG) has been testing the best value Performance Information Procurement System (PIPS), running over 530 tests on the delivery of $683M of construction services. The research results identified the low price award by the procurement function as a major source of nonperformance. It also identified that the following manifestations of the price based system: the inability of the client construction management to transfer risk and control to the contractor, the adversarial position between general, critical subcontractors and the client, the inability to differentiate, and the resulting loss of capability of the industry to preplan, proactively minimize risk, and inability to successfully administer the contract. The hypothesis testing results concluded that the issues with construction nonperformance were not technical, but management based. The issues dealt with delivery, and not construction technical performance. In 2005, PBSRG convinced the Arizona State University (the largest university in the United States at 65,000 people) Procurement office, to test this hypothesis, by using best value PIPS to procure the largest food services contract at a U.S. university, approximately $400M, ten year contract. The results of the test also convinced ASU procurement office to use the PIPS based concepts to transform the business approach of the university to a pure outsourcing approach with best value selection, information environment using dominant measurements, self administration of the contract by the contractor, and reorganization and a change of function of client procurement/management. These results validate the hypothesis testing to improve the construction industry performance. This is the first significant concept developed in construction management research that has been validated in the services industry.
KW - Best value
KW - Procurement transformation
KW - Services contracts
UR - http://www.scopus.com/inward/record.url?scp=84860377563&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84860377563&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:84860377563
SN - 9781842194348
T3 - COBRA 2008 - Construction and Building Research Conference of the Royal Institution of Chartered Surveyors
BT - COBRA 2008 - Construction and Building Research Conference of the Royal Institution of Chartered Surveyors
Y2 - 4 September 2008 through 5 September 2008
ER -