Abstract
The throughput of a factory is constrained by its bottleneck tools. TPM is a methodology that can be used to improve the efficiencies and thus the throughputs of these bottleneck tools. CUBES is a model that helps identify where improvements can be made and how much benefit can be gained from each improvement. If all bottlenecks are analyzed together, factory level throughput improvements can be made.
Original language | English (US) |
---|---|
Article number | 729425 |
Pages (from-to) | 64-67 |
Number of pages | 4 |
Journal | IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings |
DOIs | |
State | Published - Jan 1 1994 |
Externally published | Yes |
Event | 1994 International Symposium on Semiconductor Manufacturing, ISSM 1994 - Tokyo, Japan Duration: Jun 21 1994 → Jun 22 1994 |
ASJC Scopus subject areas
- Electronic, Optical and Magnetic Materials
- Industrial and Manufacturing Engineering
- Electrical and Electronic Engineering