Keyphrases
2-design
16%
Administration Costs
16%
Cost Categories
16%
Cost Estimation
16%
Cost-benefit
16%
Current Rate
16%
DC-DC
100%
DC-DC Converter
16%
Direct Costs
66%
Dual Output
100%
Estimated Cost
16%
Facility Costs
16%
Fringe Benefits
33%
Graduate Studies
50%
Health Care Services
16%
Health Departments
16%
Human Services
16%
Indirect Costs
83%
Integrated Transformer
16%
Isolated DC-DC Converter
16%
Isolated Power Converter
16%
Layout Optimization
16%
Mallik
33%
Management System Design
16%
Optimization Management
16%
PCB Layout
16%
Personnel Costs
16%
Power Converter
100%
Power Flow Optimization
16%
Power Stage
16%
Remission
33%
Research Assistants
33%
Salary
50%
Space Application
100%
Stage Design
16%
Statement of Work
16%
Summer Months
16%
Thermal Management System
16%
Total Direct Costs
33%
Tuition
33%
Wages
16%
Work Task
16%
Engineering
Cost Estimate
16%
DC-to-DC Converter
33%
Direct Cost
100%
Directional
16%
Estimated Cost
16%
Health and Human Services
16%
Indirect Cost
83%
Layout Optimization
16%
Power Converter
100%
Power Flow Optimization
16%
Power Stage
16%
Seniors
33%
Space Application
100%
Summer Month
16%