Projects per year
- 1 - 50 out of 60 results
Search results
-
Active
Diversifying Semiconductor Supply Chains
Fowler, J. (CoI), Rogers, D. (CoI), Bailey, C. (CoI), Alford, T. (CoI), Yu, H. (CoI) & Goss, J. (PI)
DOS: Bureau of Economic and Business Affairs (EBA)
2/16/24 → 2/28/26
Project: Research project
-
Finished
Travel Support for U.S. Students to Participate in the PhD Colloquium at Winter Simulation Conference 2018
Fowler, J. (PI)
National Science Foundation (NSF)
12/1/18 → 5/31/20
Project: Research project
-
Mayo Small Grant Applications
Fowler, J. (PI) & Mohan, G. (CoI)
7/1/18 → 6/30/19
Project: Research project
-
Arizona Tri-University Transportation Research Center Pilot Research Portfolio
Kuby, M. (PI), Fowler, J. (CoI), Cerveny, R. (CoI), Chester, M. (CoI), Zhou, X. (CoI), Hondula, D. (CoI), Salon, D. (CoI), King, D. (CoI) & Tong, D. (CoI)
7/1/16 → 12/31/18
Project: Research project
-
Feed the Future Egypt Food Security and Agribusiness
Fowler, J. (CoI), Manfredo, M. (CoI), Dutta, U. (CoI), Englin, J. (CoI) & Buch, R. (PI)
US Agency for International Development (USAID)
7/20/15 → 3/4/20
Project: Research project
-
-
Factory Capacity Allocation Solver for Rapid within Shift Re-Planning
Fowler, J. (PI) & Askin, R. (CoI)
12/1/09 → 12/31/10
Project: Research project
-
Risk Communication Analysis and Simulation for Pandemic Influenza Preparedness
Jehn, M. (CoI), Fowler, J. (CoI), Kim, Y. (CoI), Lant, T. (PI) & Basile, G. (CoI)
Arizona Department of Health Services
9/16/09 → 9/15/10
Project: Research project
-
Intel Capital Equipment Supply Chain Lead Time Cost-Benefit Model
Fowler, J. (PI)
12/10/08 → 12/31/11
Project: Research project
-
A Curriculum for the Science of Health Care Delivery Systems
Fowler, J. (PI)
3/1/08 → 3/1/09
Project: Research project
-
Factory Capacity Allocation Solver for Rapid within Shift Re-planning
Fowler, J. (PI) & Askin, R. (CoI)
1/1/08 → 11/30/10
Project: Research project
-
Collaborative Research: Developing an Engineering Virtual Organization for Discrete-Event Logistics Systems
Fowler, J. (PI) & Wu, T. (CoI)
National Science Foundation (NSF)
9/1/07 → 8/31/10
Project: Research project
-
Customer Relationship Management at Tyco Electronics
Fowler, J. (PI)
9/1/07 → 12/31/07
Project: Research project
-
Mayo Clinic Center for Clinical and Translational Research
Fowler, J. (PI)
HHS-NIH-NCATS: National Center for Research Resources (NCRR)
7/1/07 → 6/30/08
Project: Research project
-
-
Collaborative Research: Optimization of the Design and Operation Surgery Delivery Systems
Fowler, J. (PI)
National Science Foundation (NSF)
9/1/06 → 8/31/10
Project: Research project
-
Distributed Decision Support Framework for Adaptive Supply Chains
Fowler, J. (PI) & Wu, T. (CoI)
8/1/05 → 12/31/07
Project: Research project
-
Efficient Model Generation of AMHS Design Alternatives
Fowler, J. (CoI)
5/23/05 → 12/31/06
Project: Research project
-
Multi-Product Cycle Time and Throughput Evaluation via Simulation on Demand
Fowler, J. (PI)
9/1/04 → 8/31/07
Project: Research project
-
Multi-product Cycle Time and Throughput Evaluation
Fowler, J. (CoI)
8/15/04 → 8/15/06
Project: Research project
-
US-Mexico Partnership on Education and Technology Transfer for the Aerospace Industry
Fowler, J. (CoI)
US Agency for International Development (USAID)
5/17/04 → 9/30/07
Project: Research project
-
-
-
COLLABORATIVE RESEARCH: PROCEDURES FOR EFFICIENT CYCLE TIME-THROUGHPUT CURVE GENERATION
Fowler, J. (CoI)
National Science Foundation (NSF)
5/15/02 → 4/30/05
Project: Research project
-
CROSS-TRAINING TECHNICIANS AND ENGINEERS FOR SEMICONDUCTOR MANUFACTURING
Fowler, J. (PI) & Runger, G. (CoI)
NSF: Directorate for Education & Human Resources (EHR)
7/1/01 → 6/30/04
Project: Research project
-
SGER: SOLUTION EVALUATION METHODS FOR MULTI-OBJECTIVE COMBINATORIAL OPTIMIZATION ALGORITHMS
Fowler, J. (CoI)
National Science Foundation (NSF)
6/15/01 → 9/30/02
Project: Research project
-
-
-
SCHEDULING OF SEMICONDUCTOR WAFER FABRICATION FACILITIES
Fowler, J. (PI) & Runger, G. (CoI)
1/1/01 → 3/31/04
Project: Research project
-
NEW APPROACHES FOR SIMULATION OF WAFER FABRICATION
Fowler, J. (PI)
1/1/01 → 3/31/04
Project: Research project
-
A MODULAR, SCALABLE APPROACH TO MODELING AND ANALYSIS OF SEMICONDUCTOR MANUFACTURING SUPPLY CHAINS
Fowler, J. (PI)
National Science Foundation (NSF)
8/15/00 → 10/31/01
Project: Research project
-
THE CREATION OF AN ENTERPRISE LEVEL DYANAMIC PROGRAM MANAGEMENT DECISION SUPPORT SYSTEM
Fowler, J. (CoI)
10/1/99 → 8/31/00
Project: Research project
-
A COST MODELING METHODOLOGY FOR EVALUATION OF SEMICONDUCTOR FAM AUTOMATION
Fowler, J. (CoI)
8/15/99 → 8/15/00
Project: Research project
-
INDUSTRIAL ENGINEERING ANALYSIS CALL CENTER OPERATIONS
Fowler, J. (PI)
6/15/99 → 12/31/99
Project: Research project
-
THE CREATION OF A SCENARIO-BASED, DYNAMIC PROGRAM MANAGEMENT WORKBENCH USING THE LEAN ENTERPRISE MODEL
Fowler, J. (CoI)
5/1/99 → 4/30/00
Project: Research project
-
PERFORMANCE ANALYSIS OF SEMICONDUCTOR MANUFACTURING EQUIPMENT
Fowler, J. (PI)
2/15/99 → 5/15/99
Project: Research project
-
WORK-FROCE PLANNING FOR ENGINEERING DESIGN TEAMS
Fowler, J. (CoI)
8/15/98 → 1/30/99
Project: Research project
-
PERFORMANCE MODELING FOR THE DESIGN OF A SEMICONDUCTOR PACKAGE ASSEMBLY PROCESS
Fowler, J. (PI)
7/16/98 → 10/15/98
Project: Research project
-
CROSS-TRAINING TECHNICIANS & ENGINEERS FOR SEMICONDUCTOR MANUFACTURING
Fowler, J. (PI) & Runger, G. (CoI)
NSF: Directorate for Computer & Information Science & Engineering (CISE)
7/1/98 → 6/30/01
Project: Research project
-
RAPID PROTOTYPE OF A DECISION SUPPORT SYSTEM FOR THE LEAN ENTERPRISE MODEL
Fowler, J. (CoI)
6/15/98 → 4/30/99
Project: Research project
-
PROCEDURES FOR CAPACITY MODELING IN SEMICONDUCTOR MANUFACTURING
Fowler, J. (PI)
5/16/98 → 5/31/99
Project: Research project
-
-
A DEEPER UNDERSTANDING OF SEMICONDUCTOR MANUFACTURING
Fowler, J. (PI)
4/15/98 → 4/14/02
Project: Research project
-
MODELING AND ANALYSIS OF SEMICONDUCTOR MANUFACTURING
Fowler, J. (PI) & Runger, G. (CoI)
3/31/98 → 3/31/99
Project: Research project
-
CAPACITY MODELING IN SEMICONDUCTOR MANUFACTURING
Fowler, J. (CoI)
2/18/98 → 6/30/98
Project: Research project
-
QS9000 QUALITY SYSTEMS FOR WATER FABRICATION
Runger, G. (CoI), Montgomery, D. (CoI) & Fowler, J. (CoI)
2/18/98 → 8/31/98
Project: Research project
-
VALUE CHAIN INTEGRATION IN SEMICONDUCTOR MANUFACTURING
Fowler, J. (PI)
INDUSTRY: Various Consortium Members
2/2/98 → 12/30/98
Project: Research project
-
WAFER FAB OPERATIONS: MODELING, ANALYSIS, & DESIGN
Fowler, J. (PI) & Runger, G. (CoI)
National Science Foundation (NSF)
10/1/97 → 5/31/01
Project: Research project
-
WAFER FAB OPERATIONS:MODELING ANALYSIS & DESIGN
Fowler, J. (PI) & Runger, G. (CoI)
10/1/97 → 5/30/01
Project: Research project