Projects per year
Projects
- 872 Finished
- 350 - 400 out of 872 results
Search results
-
Finished
JLS06004A-LZ: IEC61215 full qualification testing of Jiangsu Linyang Solarfun's SF165-24-P5 photovoltaic modules
Tamizhmani, G. (PI)
6/1/07 → 10/30/08
Project: Research project
-
SOF06002: Engineering tests of Sol Focus concentrating photovoltaic modules to the IEC 62108 draft standard
Tamizhmani, G. (PI)
6/1/07 → 12/31/08
Project: Research project
-
SOF07001: Outdoor Exposure of Sol Focus concentrating photovoltaic module on a 2-axis tracker
Tamizhmani, G. (PI)
6/1/07 → 12/31/08
Project: Research project
-
SEN07001A: IEC61215 [2005-04] sequence D retesting of S-Energy SM-175MQ5 photovoltaic modules
Tamizhmani, G. (PI)
5/31/07 → 12/31/08
Project: Research project
-
SOP07002-CSA:UL 1703 tests on Solar Power Inc 170W modules
Tamizhmani, G. (PI)
5/27/07 → 12/31/08
Project: Research project
-
EVR07005:IEC61730 tests of one Evergreen Solar ES-180 photovoltaic module for TUV
Tamizhmani, G. (PI)
5/25/07 → 12/31/08
Project: Research project
-
SCO07001: IEC 61215 tests on Schueco International SPV 170 SMC-1 photovoltaic modules
Tamizhmani, G. (PI)
5/24/07 → 12/31/08
Project: Research project
-
SCO07002: IEC 61215 tests on Schueco International SPV165 SMT-1 photovoltaic modules
Tamizhmani, G. (PI)
5/24/07 → 12/31/08
Project: Research project
-
GEE07009: IEC61215:2005 qualification testing of GEPVp-200-M photovoltaic modules with PEVCD cell coating process
Tamizhmani, G. (PI)
5/24/07 → 7/31/07
Project: Research project
-
SEP07001: IEC61215:2005 qualification testing of S.E. Project SEM160S photovoltaic modules
Tamizhmani, G. (PI)
5/22/07 → 12/31/08
Project: Research project
-
SPC07002-UL: UL1703 testing of Sunpower SPR-235E photovoltaic modules
Tamizhmani, G. (PI)
5/16/07 → 12/31/08
Project: Research project
-
MIT07004: IEC61215 section I retest program for Mitsubishi Electric F180UD5B photovoltaic modules
Tamizhmani, G. (PI)
5/15/07 → 12/31/08
Project: Research project
-
PUB06001A-LZ: IEC61215 Sequence D qualification retesting on Shanghai Pubsolar GYS-165C photovoltaic modules
Tamizhmani, G. (PI)
5/11/07 → 12/31/08
Project: Research project
-
D4E07001: Outdoor Exposure Performance Monitoring Engineering Testing
Tamizhmani, G. (PI)
5/5/07 → 5/31/09
Project: Research project
-
MIT07003-UL: Humidity Freeze sequence testing of Mitsubishi Electric Modules
Tamizhmani, G. (PI)
5/4/07 → 12/31/08
Project: Research project
-
SCH07003-UL: UL 1703 tests of Schott Solar junction box samples for UL
Tamizhmani, G. (PI)
5/2/07 → 12/31/08
Project: Research project
-
SAN07002-UL:Two Temperature tests of Sanyo modules for UL
Tamizhmani, G. (PI)
5/2/07 → 12/31/08
Project: Research project
-
SXS07001-LZ: IEC61215 [2005-04] full qualification testing of Shenzhen Xinhonghua Solar XHH-170 photovoltaic modules
Tamizhmani, G. (PI)
5/1/07 → 10/30/08
Project: Research project
-
SHA07007-VDE: IEC61215:2005 qualfication testing and IEC 16730-2 safety testing of Sharp Corporation NA-901WP photovoltaic modules
Tamizhmani, G. (PI)
5/1/07 → 12/31/08
Project: Research project
-
GEE07006:IEC61215:2005 retest section I qualification testing of GEPVp-200-M photovoltaic modules
Tamizhmani, G. (PI)
4/30/07 → 12/31/08
Project: Research project
-
LIG07002-CSA: UL 1703 tests of Ligitek Electronics modules for CSA International
Tamizhmani, G. (PI)
4/27/07 → 12/31/08
Project: Research project
-
MAX07001: IEC61215 qualification testing of Ningbo Maxsolar MP-180WP photovoltaic modules
Tamizhmani, G. (PI)
4/23/07 → 12/31/08
Project: Research project
-
HTS07001:IEC 61215: 2005 qualification testing of Solaris HT210P photovoltaic modules for Helios Technologies
Tamizhmani, G. (PI)
4/23/07 → 12/31/08
Project: Research project
-
ADV07002-VDE: IEC61215 qualification testing and IEC16730-2 UI: safety testing of Advent Solar photovoltaic modules
Tamizhmani, G. (PI)
4/23/07 → 12/31/08
Project: Research project
-
STP07006: NOCT testing to California Energy Commission New Solar Homes Partnership Specifications
Tamizhmani, G. (PI)
4/17/07 → 12/31/08
Project: Research project
-
RAC07001-UL:IECEE and UL testing of RA Cell photovoltaic modules for UL
Tamizhmani, G. (PI)
4/16/07 → 12/31/08
Project: Research project
-
YNE07001: IEC 61215 [2005-04] qualification tests on Yingli New Energy YL175Pb-1 photovoltaic modules
Tamizhmani, G. (PI)
4/16/07 → 2/19/08
Project: Research project
-
YNE07003: IEC 61215 [2005-04] qualification tests on Yingli New Energy YL210Pb-1 photovoltaic modules
Tamizhmani, G. (PI)
4/16/07 → 2/19/08
Project: Research project
-
YNE07002: IEC 61215 [2005-04] qualification tests on Yingli New Energy YL210Pb-2 photovoltaic modules
Tamizhmani, G. (PI)
4/16/07 → 2/19/08
Project: Research project
-
TPS07002: IEC61215: 2005 qualification testing of Topsolar TSM-180M photovoltaic modules
Tamizhmani, G. (PI)
4/13/07 → 12/31/08
Project: Research project
-
ERA-06001A-LZ:IEC61215 sequence C testing on Zhejiang ERA Solar Technology ESPA175 photovoltaic modules
Tamizhmani, G. (PI)
4/12/07 → 12/31/08
Project: Research project
-
GEE07007: IEC61215 qualification testing of GE Energy GEPVm-150-M photovoltaic modules
Tamizhmani, G. (PI)
4/5/07 → 12/31/08
Project: Research project
-
TRN07001: IEC61215 full qualification testing of Trina Solar 170W mono-Si photovoltaic modules
Tamizhmani, G. (PI)
4/2/07 → 8/1/07
Project: Research project
-
ASU Photovoltaic Qualification Testing (Pooled Spending-Master/Operational Account)
Tamizhmani, G. (PI)
4/1/07 → 12/31/11
Project: Research project
-
GEE07005-UL:I-V measurements of GEPVc-175-M module
Tamizhmani, G. (PI)
3/29/07 → 12/31/08
Project: Research project
-
KYO07003:NOCT testing to California Energy Commission New Solar Homes Partnership specifications for BIPV rooftop modules for Kyocera Solar
Tamizhmani, G. (PI)
3/28/07 → 6/30/08
Project: Research project
-
CLI07001-UL:UL 1703 tests of Chien Luen Industries photoltaic modules for UL
Tamizhmani, G. (PI)
3/28/07 → 12/31/08
Project: Research project
-
DUP07001: Partial Discharge tests on DuPont backsheet samples
Tamizhmani, G. (PI)
3/26/07 → 9/5/07
Project: Research project
-
SHA07005: Engineering Evaluation on Sharp Electronics Corporation ND-208 Module
Tamizhmani, G. (PI)
3/15/07 → 12/31/07
Project: Research project
-
STP06007A:IEC61215 sequence B retest program for STP170AS-24Ac module type with new Aluminum paste new encapsulant and new glass
Tamizhmani, G. (PI)
3/15/07 → 6/30/08
Project: Research project
-
JIA-06002A-LZ:IEC61215 Second Edition qualification retesting seq. D on Jiawei SolarChina JW-G1600/JW5672 photovoltaic modules
Tamizhmani, G. (PI)
3/15/07 → 12/31/07
Project: Research project
-
ETS06001A-LZ: IEC61215:2005 Sequence D Retest on ET Solar ETM57201 photovoltaic modules
Tamizhmani, G. (PI)
3/15/07 → 6/30/08
Project: Research project
-
BPS07005-UL: UL 1703 testing for BP's new modules-BP3230N (and family)
Tamizhmani, G. (PI)
3/14/07 → 12/31/07
Project: Research project
-
XER07002: Engineering tests on XeroCoat photovoltaic modules
Tamizhmani, G. (PI)
3/12/07 → 6/30/08
Project: Research project
-
SHA07004-UL: UL 1703 tests on one Sharp module
Tamizhmani, G. (PI)
3/5/07 → 6/30/08
Project: Research project
-
STS06001-UL:IEC61215 and UL 1703 testing on Sun Tech Solar photovoltaic modules
Tamizhmani, G. (PI)
3/2/07 → 6/30/08
Project: Research project
-
EVR07002: IEC61215 Section A (Ed2) testing of Evergreen Solar ES-180 photovoltaic modules
Tamizhmani, G. (PI)
3/2/07 → 6/30/08
Project: Research project
-
FSC07000: First Solar array testing at the Photovoltaic Testing Laboratory
Tamizhmani, G. (PI)
3/1/07 → 4/30/08
Project: Research project
-
GEE07004: IEC61215:2005 qualification testing of GEPVc-170-M photovoltaic modules
Tamizhmani, G. (PI)
2/26/07 → 12/31/07
Project: Research project